Design steel and wood connections, including base plates with concrete anchorage checks.
Design simple shear connections for I-beams or channels connecting to girders or columns.
Design fully restrained beam-to-column moment connections and column splices
Get hand-calculation-style reports with all limit state checks, equations, and code references.
Skip tedious bookkeeping by importing load sets from VisualAnalysis, VisualFoundation, or ConcreteBending.
For complete information regarding the limit-states checked and training videos, refer to the User's Guide.

Try VisualAnalysis and VAConnect together to export connections and design them seamlessly. The free trials are fully functional and integrate smoothly. The BuildingSuite includes VisualAnalysis Advanced, VisualFoundation, VAConnect, and ShapeBuilder—bundled at a discount. Learn more about suites and product integration.